Balakot Dam and Hydroelectric Power Plant – Pakistan
The River Diversion has been successfully achieved at the Balakot Dam and HEPP Project. The project consists of a 58 m high concrete-gravity dam, a 9.1 km long energy tunnel and an underground power plant with an installed capacity of 300 MW. DOLSAR is providing Project Management Consultancy Services and the project is co-financed by ADB and AIIB.