2nd Pakistan Energy Reform Summit – Pakistan
DOLSAR attended the 2nd Pakistan Energy Reform Summit, which took place in Islamabad, Pakistan.
DOLSAR attended the 2nd Pakistan Energy Reform Summit, which took place in Islamabad, Pakistan.
DOLSAR made a technical presentation and attended the 3rd BH Water Congress, which took place in Sarajevo, Bosnia and Herzegovina. The topic of the presentation was Drinking Water Supply Under Drought and Climate Change Impacts.
Construction works are underway at UMEA Commercial and Residential Complex in Kampala, Uganda. DOLSAR is providing detailed design and construction supervision services. The project is financed by the Islamic Development Bank.
DOLSAR is attending the Hydro 2022 International Conference and Exhibition taking place in Strasbourg, France. The theme of this year’s conference is Roles of Hydro in the Global Recovery.
Works are underway at Sarıçay Dam, where DOLSAR is providing Construction Design services. Once completed, the Roller Compacted Concrete (RCC) Dam will have a height of 125 m.
DOLSAR has signed a new contract for the preparation of revised feasibility study of Bakırcay Mansap Basins Irrigation Project. The irrigation area of the project will be 20,634 ha and 6 hm3/year drinking water will be supplied to the district of Soma.
The stekaholder engagement & community meeting of the Kurram Tangi Integrated Water Resources Development project was held in Bannu, Pakistan. Main project components include a 98-meter-high concrete faced rockfill dam located across the Kurram River in North Waziristan in Khyber Pakhtunkhwa (KP) Province, three hydroelectric powerhouses with combined installed...
DOLSAR has signed a new contract to provide detailed design services for the Sludge Storage Dam of Kayseri Metropolitan Municipality.
The geotechnical investigations of Balakot Dam and HEPP are underway. DOLSAR is providing Project Management Consultancy Services for the project which will have an installed capacity of 300 MW. The project is co-financed by Asian Development Bank and Asian Infrastructure Investment Bank.
DOLSAR has signed a new contract for the preparation of Detailed Design of Sincan (Temelli) Advanced Biological Waste Water Treatment Plant. The plant will be designed to have a capacity of 140,000 m3/day.